skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Beamline Design and Beam Diagnostic for Mo-99 Production Facility Utilizing High Power Electron Accelerators

Technical Report ·
DOI:https://doi.org/10.2172/1570007· OSTI ID:1570007
 [1];  [1];  [1];  [1]
  1. Argonne National Lab. (ANL), Argonne, IL (United States). Experimental Operations and Facilities Div.

NorthStar Medical Isotope, LLC, is planning to produce 99Mo through a γ,n reaction on 100Mo. This pathway for 99Mo production relies on the use of high-power electron accelerators, which are not currently commercially available. IBA Industrial announced in its Summer 2017 newsletter (http://iba-industrial.com/emailing/2017-beamline/index.html) that they have begun working on pulsed Rhodotron features (New Horizon project). This accelerator is capable of producing a high power and high energy electron beam suitable for production via a photonuclear route. Argonne National Laboratory (Argonne), in collaboration with Los Alamos National Laboratory (LANL), provided assistance to NorthStar in technology development. Over the course of several years, we have conducted several demonstrations of the technology that proved the feasibility of photo-nuclear approach. The target, designed by LANL, is composed of a series of 99Mo disks held in a target holder with cooling gaps between the thin disks. Cooling of the target is provided by flowing helium gas under high pressure through the target holderHandling the high-power beam requires a carefully designed beam transport system because of likely vacuum failure if the beam strikes an uncooled part of the system. This publication summarizes recommendations on the beam transport line equipment, costs, and on the optional components.

Research Organization:
Argonne National Lab. (ANL), Argonne, IL (United States)
Sponsoring Organization:
USDOE National Nuclear Security Administration (NNSA) - Office of Defense Nuclear Nonproliferation - Office of Material Management and Minimization (M3)
DOE Contract Number:
AC02-06CH11357
OSTI ID:
1570007
Report Number(s):
ANL-19/10; 150825; TRN: US2000038
Country of Publication:
United States
Language:
English

Similar Records

Integration of High-Z Converter into Full-scale Production Target for Accelerator-based Production of 99Mo
Technical Report · Sat Feb 01 00:00:00 EST 2020 · OSTI ID:1570007

Testing of Helium-Cooled Metal Molybdenum Disk Target
Technical Report · Fri Mar 01 00:00:00 EST 2024 · OSTI ID:1570007

Thermal Test of 29 mm and 12 mm Targets
Technical Report · Sun Sep 01 00:00:00 EDT 2019 · OSTI ID:1570007

Related Subjects