skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Proposed Enhanced Imaging Station in the 6-GeV Booster-to-Storage Ring Transport Line for APS Upgrade

Conference ·
OSTI ID:1565926

The high charge per micropulse of up to 17 nC in the booster to storage ring transport line (BTS) for APS Upgrade will necessitate changes in the imaging station used to evaluate beam emittance in this key region. The original Chromox screen has recently been replaced by a YAG:Ce single crystal for immediate screen spatial resolution improvement down to <10 µm. However, the optical system also needs an upgrade with lenses and a digital camera to take full advantage of this enhancement. In addition, at the high areal charge densities expected, the YAG:Ce scintillator mechanism will saturate, or quench, leading to images larger than the actual beam size. To circumvent this effect, optical transition radiation (OTR) screens will be implemented. A proposed longer-range goal of a non-intercepting beam-size monitor using optical diffraction radiation techniques during top-up injection will also be addressed.

Research Organization:
Argonne National Lab. (ANL), Argonne, IL (United States); Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1565926
Report Number(s):
FERMILAB-CONF-19-437-AD; oai:inspirehep.net:1755018
Resource Relation:
Conference: 3rd North American Particle Accelerator Conference (NAPAC2019), Lansing, Michigan, 09/01-09/06/2019
Country of Publication:
United States
Language:
English

Similar Records

Related Subjects