Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Parallel reservoir automatic history matching using a network of workstations and PVM

Conference ·
OSTI ID:153063
This paper describes a new computing environment for reservoir automatic history matching. A parallel simulated annealing algorithm is used to estimate geologic and reservoir engineering parameters by automatically ,aching production history of an actual oil reservoir. A complex computer set-up using two networks of workstations simultaneously, located at the New Mexico Petroleum Recovery Research Center (PRRC) and the Los Alamos National Laboratory (LANL), is used to test the concept of distributed optimization. A heterogeneous cluster of two workstations (HP and SUN) is used at the PRRC and a homogeneous cluster of six IBM RISC 6000 workstations is used at LANL. At each site (PRCC and LANL), a Parallel Virtual Machine is created by using the message passing software, PVM. Communication between the two parallel virtual machines located at the PRRC and LANL is achieved with a simple e-mail protocol. In this new environment, the total time required to complete a 22 well oil reservoir study lead to the following observation: two-thirds of the time was devoted to geologic, core, and well log analyses, and one-third of the time to history matching.
OSTI ID:
153063
Report Number(s):
CONF-950206--
Country of Publication:
United States
Language:
English

Similar Records

Parallelization of ITOUGH2 using PVM
Technical Report · Thu Oct 01 00:00:00 EDT 1998 · OSTI ID:6438

MCNP load balancing and fault tolerance with PVM
Conference · Sat Jul 01 00:00:00 EDT 1995 · OSTI ID:97130

Parallel computation of genetic likelihoods using CRI-MAP, PVM, and a network of distributed workstations
Journal Article · Thu Sep 01 00:00:00 EDT 1994 · American Journal of Human Genetics · OSTI ID:134073