skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Using Synchrophasors to Improve Bulk Power System Reliability in North America

Conference ·

Maintaining reliable operation of the bulk power system is a fundamental aspect of grid operation, and focuses on ensuring the system can withstand sudden disturbances or unanticipated failures of system elements such that instability, uncontrolled separation, or cascading failures will not occur. Phasor measurement units (PMUs) provide the capability for enhanced real-time monitoring and control room solutions as well as improved power system analysis in the planning horizon. With over 1,700 PMUs deployed in the North American grid, numerous PMU-based applications have been developed. This paper summarizes synchrophasor-based applications and presents utility synchrophasor experience.

Research Organization:
Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-76RL01830
OSTI ID:
1511686
Report Number(s):
PNNL-SA-130540
Resource Relation:
Conference: 2018 IEEE General Meeting
Country of Publication:
United States
Language:
English