Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Electric Demand Reduction for the U.S. Navy Public Works Center San Diego, California

Technical Report ·
DOI:https://doi.org/10.2172/15020982· OSTI ID:15020982
Pacific Northwest National Laboratory investigated the profitability of operating a Navy ship's generators (in San Diego) during high electricity price periods rather than the ships hooking up to the Base electrical system for power. Profitability is predicated on the trade-off between the operating and maintenance cost incurred by the Navy for operating the ship generators and the net profit associated with the sale of the electric power on the spot market. In addition, PNNL assessed the use of the ship's generators as a means to achieve predicted load curtailments, which can then be marketed to the California Independent System Operator.
Research Organization:
Pacific Northwest National Laboratory (PNNL), Richland, WA (US)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-76RL01830
OSTI ID:
15020982
Report Number(s):
PNNL-13350; 400403309
Country of Publication:
United States
Language:
English