Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

CONSTRUCTION AND POWER TEST OF THE EXTRACTION KICKER MAGNET FOR SNS ACCUMULATOR RING.

Conference ·
OSTI ID:15016162
Two extraction kicker magnet assemblies that contain seven individual pulsed magnet modules each will kick the proton beam vertically out of the SNS accumulator ring into the aperture of the extraction Lambertson septum magnet. The proton beam then travels to the 1.4 MW SNS target assembly. The 14 kicker magnets and major components of the kicker assembly have been fabricated in BNL. The inner surfaces of the kicker magnets were coated with TiN to reduce the secondary electron yield. All 14 PFN power supplies have been built, tested and delivered to OWL. Before final installation, a partial assembly of the kicker system with three kicker magnets was assembled to test the functions of each critical component in the system. In this paper we report the progress of the construction of the kicker components, the TIN coating of the magnets, the installation procedure of the magnets and the full power test of the kicker with the PFN power supply.
Research Organization:
BROOKHAVEN NATIONAL LABORATORY (US)
Sponsoring Organization:
DOE/SC (US)
DOE Contract Number:
AC02-98CH10886
OSTI ID:
15016162
Report Number(s):
BNL--73405-2005-CP; ISBN KB-02-02-01-1
Country of Publication:
United States
Language:
English

Similar Records

SNS EXTRACTION KICKER POWER SUPPLY PROTOTYPE TEST
Conference · Tue Jun 27 00:00:00 EDT 2000 · OSTI ID:760992

Kicker and Pulser Systems-Required for Pbar Manipulations in the Main Ring and Tevatron
Technical Report · Tue Jan 31 23:00:00 EST 1984 · OSTI ID:1974219

EXTRACTION SYSTEM DESIGN FOR THE BSNS/RCS.
Conference · Fri Jun 23 00:00:00 EDT 2006 · OSTI ID:885010