Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

AGS UPGRADE TO 1-MW WITH A SUPER CONDUCTING LINAC INJECTOR.

Conference ·
OSTI ID:15006643
It has been proposed to upgrade the Alternating Gradient Synchrotron (AGS) accelerator complex at the Brookhaven National Laboratory (BNL) to provide an average proton beam power of 1 MW at the energy of 28 GeV. The facility is to be primarily used as a proton driver for the production of intense neutrino beams [l]. This paper reports on the feasibility study of a proton Super-Conducting Linac (SCL) as a new injector to the AGS. The Linac beam energy is 1.3 GeV. The beam intensity is adjusted to provide the required average beam power of 1 MW at 28 GeV. The repetition rate of the SCL-AGS facility is 2.5 beam pulses per second.
Research Organization:
BROOKHAVEN NATIONAL LABORATORY (US)
Sponsoring Organization:
DOE/SC (US)
DOE Contract Number:
AC02-98CH10886
OSTI ID:
15006643
Report Number(s):
BNL--69589-CP; KB0202011
Country of Publication:
United States
Language:
English

Similar Records

A SUPER-CONDUCTING LINAC INJECTOR FOR THE BNL-AGS.
Conference · Mon Aug 21 00:00:00 EDT 2000 · OSTI ID:779789

A Super-Conducting Linac as a new Injector to the BNL-AGS
Technical Report · Wed Jan 31 23:00:00 EST 2001 · OSTI ID:1061635

A Super-Conducting Linac Injector to the BNL-AGS
Technical Report · Wed Jan 31 23:00:00 EST 2001 · OSTI ID:1061634