AGS UPGRADE TO 1-MW WITH A SUPER CONDUCTING LINAC INJECTOR.
Conference
·
OSTI ID:15006643
It has been proposed to upgrade the Alternating Gradient Synchrotron (AGS) accelerator complex at the Brookhaven National Laboratory (BNL) to provide an average proton beam power of 1 MW at the energy of 28 GeV. The facility is to be primarily used as a proton driver for the production of intense neutrino beams [l]. This paper reports on the feasibility study of a proton Super-Conducting Linac (SCL) as a new injector to the AGS. The Linac beam energy is 1.3 GeV. The beam intensity is adjusted to provide the required average beam power of 1 MW at 28 GeV. The repetition rate of the SCL-AGS facility is 2.5 beam pulses per second.
- Research Organization:
- BROOKHAVEN NATIONAL LABORATORY (US)
- Sponsoring Organization:
- DOE/SC (US)
- DOE Contract Number:
- AC02-98CH10886
- OSTI ID:
- 15006643
- Report Number(s):
- BNL--69589-CP; KB0202011
- Country of Publication:
- United States
- Language:
- English
Similar Records
A SUPER-CONDUCTING LINAC INJECTOR FOR THE BNL-AGS.
A Super-Conducting Linac as a new Injector to the BNL-AGS
A Super-Conducting Linac Injector to the BNL-AGS
Conference
·
Mon Aug 21 00:00:00 EDT 2000
·
OSTI ID:779789
A Super-Conducting Linac as a new Injector to the BNL-AGS
Technical Report
·
Wed Jan 31 23:00:00 EST 2001
·
OSTI ID:1061635
A Super-Conducting Linac Injector to the BNL-AGS
Technical Report
·
Wed Jan 31 23:00:00 EST 2001
·
OSTI ID:1061634