Title: ADVANCEMENT OF THE RHIC BEAM ABORT KICKER SYSTEM.

Conference ·
OSTI ID:15006641

As one of the most critical system for RHIC operation, the beam abort kicker system has to be highly available, reliable, and stable for the entire operating range. Along with the RHIC commission and operation, consistent efforts have been spend to cope with immediate issues as well as inherited design issues. Major design changes have been implemented to achieve the higher operating voltage, longer high voltage hold-off time, fast retriggering and redundant triggering, and improved system protection, etc. Recent system test has demonstrated for the first time that both blue ring and yellow ring beam abort systems have achieved more than 24 hours hold off time at desired operating voltage. In this paper, we report break down, thyratron reverse arcing, and to build a fast re-trigger system to reduce beam spreading in event of premature discharge.

Research Organization:
BROOKHAVEN NATIONAL LABORATORY (US)
Sponsoring Organization:
DOE/SC (US)
DOE Contract Number:
AC02-98CH10886
OSTI ID:
15006641
Report Number(s):
BNL-69627-CP; R&D Project: AD003; KB0202011; TRN: US0400948
Resource Relation:
Conference: 2003 PARTICLE ACCELERATOR CONFERENCE, PORTLAND, OR (US), 05/12/2003--05/16/2003; Other Information: PBD: 12 May 2003
Country of Publication:
United States
Language:
English

Similar Records

RHIC BEAM ABORT KICKER POWER SUPPLY SYSTEM COMMISSIONING EXPERIENCE AND REMAINING ISSUES.
Conference · Mon Jun 18 00:00:00 EDT 2001 · OSTI ID:15006641

AN ENGINEERING SOLUTION TO THE RHIC BEAM ABORT KICKER UPGRADE.
Conference · Sun May 23 00:00:00 EDT 2004 · OSTI ID:15006641

GAS DISCHARGE SWITCH EVALUATION FOR RHIC BEAM ABORT KICKER APPLICATION.
Conference · Sun Jun 30 00:00:00 EDT 2002 · OSTI ID:15006641