Quality Control, Testing, and Deployment Results in the NIF ICCS
Conference
·
OSTI ID:15005545
The strategy used to develop the NIF Integrated Computer Control System (ICCS) calls for incremental cycles of construction and formal test to deliver a total of 1 million lines of code. Each incremental release takes four to six months to implement specific functionality and culminates when offline tests conducted in the ICCS Integration and Test Facility verify functional, performance, and interface requirements. Tests are then repeated on line to confirm integrated operation in dedicated laser laboratories or ultimately in the NIF. Test incidents along with other change requests are recorded and tracked to closure by the software change control board (SCCB). Annual independent audits advise management on software process improvements. Extensive experience has been gained by integrating controls in the prototype laser preamplifier laboratory. The control system installed in the preamplifier lab contains five of the ten planned supervisory subsystems and seven of sixteen planned front-end processors (FEPs). Beam alignment, timing, diagnosis and laser pulse amplification up to 20 joules was tested through an automated series of shots. Other laboratories have provided integrated testing of six additional FEPs. Process measurements including earned-value, product size, and defect densities provide software project controls and generate confidence that the control system will be successfully deployed.
- Research Organization:
- Lawrence Livermore National Lab., CA (US)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- W-7405-ENG-48
- OSTI ID:
- 15005545
- Report Number(s):
- UCRL-JC-143318
- Country of Publication:
- United States
- Language:
- English
Similar Records
Testing and Quality Assurance of the Control System During NIF Commissioning
NIF ICCS Test Controller for Automated & Manual Testing
NIF ICCS network design and loading analysis
Conference
·
Mon Oct 13 00:00:00 EDT 2003
·
OSTI ID:15005464
NIF ICCS Test Controller for Automated & Manual Testing
Conference
·
Wed Oct 03 00:00:00 EDT 2007
·
OSTI ID:922307
NIF ICCS network design and loading analysis
Technical Report
·
Thu Feb 19 23:00:00 EST 1998
·
OSTI ID:14873