Title: A Human Factors Engineering Process to Support Human-System Interface Design in Control Room Modernization

Abstract

The primary objective of the United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program is to sustain operation of the existing commercial nuclear power plants (NPPs) through a multi-pathway approach in conducting research and development (R&D). The Advanced Instrumentation, Information, and Control (II&C) System Technologies pathway conducts targeted R&D to address aging and reliability concerns with legacy instrumentation and control (I&C) and other information systems in existing U.S. NPPs. Control room modernization is an important part following this pathway, and human factors experts at Idaho National Laboratory (INL) have been involved in conducting R&D to support migration of new digital main control room (MCR) technologies from legacy analog and legacy digital I&C. This paper describes a human factors engineering (HFE) process that supports human-system interface (HSI) design in MCR modernization activities, particularly with migration of old digital to new digital I&C. The process described in this work is an expansion from the LWRS Report INL/EXT-16-38576, and is a requirements-driven approach that aligns with NUREG-0711 requirements. The work described builds upon the existing literature by adding more detail around key tasks and decisions to make when transitioning from HSI Design into Verification and Validation (V&V). The overallmore » objective of this process is to inform HSI design and elicit specific, measurable, and achievable human factors criteria for new digital technologies. Upon following this process, utilities should have greater confidence with transitioning from HSI design into V&V.« less

Authors:
ORCiD logo [1]; ORCiD logo [1]
  1. Idaho National Laboratory
Publication Date:
Research Org.:
Idaho National Lab. (INL), Idaho Falls, ID (United States)
Sponsoring Org.:
USDOE Office of Nuclear Energy (NE)
OSTI Identifier:
1484709
Report Number(s):
INL/CON-16-40403-Rev000
DOE Contract Number:  
AC07-05ID14517
Resource Type:
Conference
Resource Relation:
Conference: 10th International Embedded Topical Meeting on Nuclear Plant Instrumentation, Control & Human-Machine Interface Technologies NPIC & HMIT 2017, San Francisco, CA, USA - Hyatt Regency San Francisco, 06/11/2017 - 06/15/2017
Country of Publication:
United States
Language:
English
Subject:
99 - GENERAL AND MISCELLANEOUS; Human-System Interface; Human Factoring Engineering; Control Room Modernization

Citation Formats

J.C., Joe,, and R.L., Boring,. A Human Factors Engineering Process to Support Human-System Interface Design in Control Room Modernization. United States: N. p., 2017. Web.
J.C., Joe,, & R.L., Boring,. A Human Factors Engineering Process to Support Human-System Interface Design in Control Room Modernization. United States.
J.C., Joe,, and R.L., Boring,. Wed . "A Human Factors Engineering Process to Support Human-System Interface Design in Control Room Modernization". United States. https://www.osti.gov/servlets/purl/1484709.
@article{osti_1484709,
title = {A Human Factors Engineering Process to Support Human-System Interface Design in Control Room Modernization},
author = {J.C., Joe, and R.L., Boring,},
abstractNote = {The primary objective of the United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program is to sustain operation of the existing commercial nuclear power plants (NPPs) through a multi-pathway approach in conducting research and development (R&D). The Advanced Instrumentation, Information, and Control (II&C) System Technologies pathway conducts targeted R&D to address aging and reliability concerns with legacy instrumentation and control (I&C) and other information systems in existing U.S. NPPs. Control room modernization is an important part following this pathway, and human factors experts at Idaho National Laboratory (INL) have been involved in conducting R&D to support migration of new digital main control room (MCR) technologies from legacy analog and legacy digital I&C. This paper describes a human factors engineering (HFE) process that supports human-system interface (HSI) design in MCR modernization activities, particularly with migration of old digital to new digital I&C. The process described in this work is an expansion from the LWRS Report INL/EXT-16-38576, and is a requirements-driven approach that aligns with NUREG-0711 requirements. The work described builds upon the existing literature by adding more detail around key tasks and decisions to make when transitioning from HSI Design into Verification and Validation (V&V). The overall objective of this process is to inform HSI design and elicit specific, measurable, and achievable human factors criteria for new digital technologies. Upon following this process, utilities should have greater confidence with transitioning from HSI design into V&V.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2017},
month = {6}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: