Tooling Systems for the Assembly and Integration of the SSR1 Cryomodule for PIP-II Project at Fermilab
- Fermilab
In this paper we present the assembly strategy and tooling design for the SSR1 cryomodule from the cavity string to the final module. Several challenging aspects were considered to minimize undesired stresses on critical components, to preserve the alignment of cavities and solenoids during final assembly, and ultimately to meet the technical requirements of the PIP-II project at Fermilab.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1484466
- Report Number(s):
- FERMILAB-CONF-18-610-TD; 1697801
- Resource Relation:
- Conference: 9th International Particle Accelerator Conference, Vancouver, BC Canada, 04/29-05/04/2018
- Country of Publication:
- United States
- Language:
- English
Similar Records
Test Results of the Prototype SSR1 Cryomodule for PIP-II at Fermilab
Computer Vision Techniques Used to Monitor the Alignment of Cavities and Solenoids in the PIP-II Prototype SSR1 Cryomodule
Alignment Monitoring System for the PIP-II Prototype SSR1 Cryomodule
Conference
·
Tue Aug 10 00:00:00 EDT 2021
·
OSTI ID:1484466
+14 more
Computer Vision Techniques Used to Monitor the Alignment of Cavities and Solenoids in the PIP-II Prototype SSR1 Cryomodule
Conference
·
Tue Aug 10 00:00:00 EDT 2021
·
OSTI ID:1484466
Alignment Monitoring System for the PIP-II Prototype SSR1 Cryomodule
Conference
·
Sat Aug 17 00:00:00 EDT 2019
·
OSTI ID:1484466
+1 more