Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Publicly Accessible Charging Site Host Recruitment During The EV Project

Technical Report ·
DOI:https://doi.org/10.2172/1483588· OSTI ID:1483588

Several assumptions were established at the start of The EV Project. One of the assumptions upon which the Project was based was that plug-in electric vehicle (PEV) drivers would require some form of charging infrastructure away from their residences. The basic need for infrastructure outside the home was assumed to be a key foundation of future EV growth. This assumption was based on surveys conducted as part of the EV Project1, on previous experience of The EV Project management team with charging infrastructure deployment and use, and on a strong desire by Nissan (which was the initial PEV partner of The EV Project), to have visible away-from-home charging infrastructure to support vehicle sales. It was assumed that PEV drivers would have range anxiety and have an expectation that charging infrastructure will be there for their use.

Research Organization:
Idaho National Laboratory (INL), Idaho Falls, ID (United States)
Sponsoring Organization:
USDOE Office of Energy Efficiency and Renewable Energy (EERE)
DOE Contract Number:
AC07-05ID14517
OSTI ID:
1483588
Report Number(s):
INL/EXT--15-36334-Rev000
Country of Publication:
United States
Language:
English

Similar Records

The EV Project Price/Fee Models for Publicly Accessible Charging
Technical Report · Mon Nov 30 23:00:00 EST 2015 · OSTI ID:1374785

What Use Patterns Were Observed for PEV Drivers at Publicly Accessible AC Level 2 EVSE Sites?
Technical Report · Mon Nov 30 23:00:00 EST 2015 · OSTI ID:1261007

How Do The EV Project Participants Feel about Charging Their EV at Home?
Technical Report · Sat Jan 31 23:00:00 EST 2015 · OSTI ID:1183498