skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Summary of BISON Development and Validation Activities - NEAMS FY15 Report

Technical Report ·
DOI:https://doi.org/10.2172/1482993· OSTI ID:1482993

The objective of the NEAMS ToolKit is to develop a “pellet-to-plant” simulation capability useful for predicting performance and safety for a broad range of nuclear reactor power systems. The NEAMS ToolKit has been organized into a Fuels Product Line (FPL) and a Reactor Product Line (RPL) and is modular in design. Within the FPL, a multiscale approach has been adopted in which simulations of fuel performance at the engineering scale are informed by material property and irradiation performance models developed from mesoscale simulations of microstructural evolution. The focus in this report is on development and validation of the engineering-scale fuel performance analysis tool within the FPL, which is BISON. This summary report contains an overview of work performed under the work package enti- tled “FY2015 NEAMS INL-Engineering Scale Fuel Performance & Interface with RPL Tools.” A first chapter identifies the specific FY-15 milestones, providing a basic description of the asso- ciated work and references to related detailed documentation. Where applicable, a representative technical result is provided. A second chapter summarizes major additional accomplishments including 1) a BISON validation paper, 2) a multiphysics coupling paper, 3) application of BI- SON to Reactivity Insertion Accident analysis and 4) use of BISON for uncertainity analysis in fuel modeling. A final chapter outlines FY-16 future work.

Research Organization:
Idaho National Lab. (INL), Idaho Falls, ID (United States)
Sponsoring Organization:
USDOE Office of Nuclear Energy (NE)
DOE Contract Number:
AC07-05ID14517
OSTI ID:
1482993
Report Number(s):
INL/EXT-15-36779-Rev000
Country of Publication:
United States
Language:
English

Similar Records

Summary of BISON Development Activities: NEAMS FY14 Report
Technical Report · Wed Oct 01 00:00:00 EDT 2014 · OSTI ID:1482993

Warthog: Progress on Coupling BISON and PROTEUS
Technical Report · Thu Sep 01 00:00:00 EDT 2016 · OSTI ID:1482993

Summary of BISON Development and Validation Activities - NEAMS FY16 Report
Technical Report · Thu Sep 01 00:00:00 EDT 2016 · OSTI ID:1482993