ATDM ASD report for ECP October 2018
- Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
In October the team merged in updated ATDM/Trilinos configuration to include SPARC requirements. Assisted and worked on issues identified by the EMPIRE switchover to the ATDM/Trilinos configuration. Progress was made on automating dashboard triaging. Discovered and began addressing issues with mixed language calling with gcc-7.2 on Power8. Worked on new Python tool to filter CDASH reports to only show new issues. Completed ECP ST review. In October the team put an algorithm in place to prevent inverted elements in SPARC during refinement and worked on tests to morph mesher and should be ready for SGM integration soon. The team worked on solver rebalance and corrected issues. Complete SIMD work. Worked out next steps for solver improvements for EMPIRE. Adjusted some solver settings and to improve performance; strong scaling curves are flat instead of ascending etc. Worked on optimizing kernels for SPARC. Completed ECP ST reviews. The team worked on cleaning up branch for merge into SPARC master dev branch. Progress was made building scripts for catalyst builds on all HPC platforms of interest. Worked on adding TuckerMPl reader as plugin for catalyst. Completed ECP project review. Work has continued on NimbleSM, which now runs in a container and can be used modularly with an MPI code. The team also made progress on a qthreads version of NibleSM. Worked on build system issues within NimbleSM and Sierra for GPUs. Progressed on getting kookfied material models in NimbleSM. The team incorporated panel feedback form ECP project reviews into FY19 plans.
- Research Organization:
- Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)
- Sponsoring Organization:
- USDOE National Nuclear Security Administration (NNSA)
- DOE Contract Number:
- AC04-94AL85000; NA0003525
- OSTI ID:
- 1481550
- Report Number(s):
- SAND--2018-12333R; 669024
- Country of Publication:
- United States
- Language:
- English
Similar Records
Monthly report for ECP ATDM ST projects (August 2018)
STPR 04 Milestone 6 Report.
Accomplishments of Sandia and Kitware CMake/CTest/CDash Contract for (FY2017-2020)
Technical Report
·
Tue Aug 21 00:00:00 EDT 2018
·
OSTI ID:1467544
STPR 04 Milestone 6 Report.
Technical Report
·
Wed Sep 19 00:00:00 EDT 2018
·
OSTI ID:1481606
Accomplishments of Sandia and Kitware CMake/CTest/CDash Contract for (FY2017-2020)
Technical Report
·
Sat May 01 00:00:00 EDT 2021
·
OSTI ID:1784597