Louisiana Title V General Permits
Conference
·
OSTI ID:147991
Title V of the Federal Clean Air Act Amendments of 1990 requires federal operating permits for all major sources of air pollution. In 1992, Title 40, Part 70 of the Code of Federal Regulations (40 CFR Part 70) codified the law s requirements. These federal regulations, entitled Operating Permit Program, define the minimum requirements for state administered operating permit programs. The intent of Title V is to put into one document all requirements of an operating permit. General Permits for oil and gas facilities may be preferred if the facility can comply with all permit requirements. If greater flexibility than allowed by the General Permit is required, then the facility should apply for an individual Title V permit. General Permits are designed to streamline the permitting process, shorten the time it takes to obtain approval for initial and modified permits. The advantages of the General Permit include reduced paperwork and greater consistency because the permits are standardized. There should be less uncertainty because permit requirements will be known at the time of application. Approval times for Initial and modified General Permits should be reduced. Lengthy public notice procedures (and possible hearings) will be required for only the initial approval of the General Permit and not for each applicant to the permit. A disadvantage of General Permits is reduced flexibility since the facility must comply with the requirements of a standardized permit.
- OSTI ID:
- 147991
- Report Number(s):
- CONF-950152--
- Country of Publication:
- United States
- Language:
- English
Similar Records
Optimizing operational flexibility and enforcement liability in Title V permits
Facing Title V permit constraints
Implementation of Title V requirements at an aerospace manufacturing and rework facility
Conference
·
Tue Dec 30 23:00:00 EST 1997
·
OSTI ID:353591
Facing Title V permit constraints
Journal Article
·
Thu Jun 01 00:00:00 EDT 1995
· Pollution Engineering
·
OSTI ID:85981
Implementation of Title V requirements at an aerospace manufacturing and rework facility
Conference
·
Wed Dec 30 23:00:00 EST 1998
·
OSTI ID:679346