Title: E Tunnel Wastewater Disposal System Quarterly Monitoring Report Nevada National Security Site, Nevada Water Pollution Control Permit NEV 96021, Third Quarter 2018

Technical Report ·
DOI:https://doi.org/10.2172/1478516· OSTI ID:1478516

This report includes the results of the E Tunnel Wastewater Disposal System (ETDS) inspections and monitoring for July, August, and September 2018. Monitoring and sampling activities were performed in accordance with the requirements of Water Pollution Control Permit NEV 96021, Revision 1, effective October 1, 2013. Monthly monitoring was conducted on July 16, August 13, and September 13, 2018. Operating personnel measured the instantaneous flow rate (see Table 1), log hydrogen ion activity (pH), temperature, and specific conductance of the discharge water (see Table 2). Monthly inspections also included an assessment of the general condition of the berms, including ponding (the water levels relative to the overflow pipes); any tunneling or burrowing into the berms; soil conditions on and around the berms, including erosion or sloughing of the interior or exterior slopes of the berms; seeps at the toe of the berms; the presence of any deep-rooting botanicals on the berms; and the physical condition of fencing (see Tables 3 through 7). Monthly rainfall quantities are presented in Table 8.

Research Organization:
Navarro, Las Vegas, NV (United States)
Sponsoring Organization:
USDOE Office of Environmental Management (EM)
DOE Contract Number:
NA0002653
OSTI ID:
1478516
Report Number(s):
DOE/NV-1600
Country of Publication:
United States
Language:
English