Title: Initial performance of the magnet system in the splitter/combiner section of the Cornell-Brookhaven Energy-Recovery Linac Test Accelerator

Technical Report ·
DOI:https://doi.org/10.2172/1475158· OSTI ID:1475158
 [1];  [2]
  1. Cornell Univ., Ithaca, NY (United States)
  2. Brookhaven National Lab. (BNL), Upton, NY (United States)

The Cornell-Brookhaven Energy-recovery Linac Test Ac- celerator is a four-pass, 150-MeV electron accelerator with a six-cell 1.3 GHz superconducting-RF linear accelerator and a fixed-field alternating-gradient (FFAG) return loop made up of Halbach-style quadrupole magnets. The optics matching between the linear accelerator and the return loop is achieved with a conventional magnet system comprised of 50 dipole magnets and 64 quadrupole magnets in four beamlines at each end of the linac. The 42-, 78-, 114- and 150-MeV electron beams are separated into independent vacuum chambers in order to allow for the path-length ad- justment required by energy recovery. We report on the first beam tests of the initial installation of the splitter/combiner section at the exit of the linac. The vacuum system of the 42-MeV S1 line was installed during the first week of April. Nine dipole and four quadrupole magnets were installed and surveyed into position the following week, and the water cooling system was commissioned. A 6-MeV beam passed through the line on April 11 with no need for adjusting pre-set magnet excitation currents. One week later, time- of-flight measurements were used to calibrate and phase the individual superconducting RF cavities. The S1 magnet settings were then scaled up to achieve 5-cavity, 42-MeV operation through the first nine FFAG permanent-magnet quadrupoles. This initial Fractional Arc Test will conclude on May 18, when the installation of the remaining seven split- ter/combiner lines and the return loop will begin. CBETA operations are scheduled to begin in early 2019.

Research Organization:
Brookhaven National Lab. (BNL), Upton, NY (United States)
Sponsoring Organization:
USDOE Office of Science (SC), Nuclear Physics (NP); New York State Energy Research and Development Authority (NYSERDA)
DOE Contract Number:
SC0012704
OSTI ID:
1475158
Report Number(s):
CBETA/026; BNL-209090-2018-TECH
Country of Publication:
United States
Language:
English