Enabling fast charging – Infrastructure and economic considerations
Journal Article
·
· Journal of Power Sources
more »
- Argonne National Lab. (ANL), Argonne, IL (United States)
- Idaho National Lab. (INL), Idaho Falls, ID (United States)
- National Renewable Energy Lab. (NREL), Golden, CO (United States)
The ability to charge battery electric vehicles (BEVs) on a time scale that is on par with the time to fuel an internal combustion engine vehicle (ICEV) would remove a significant barrier to the adoption of BEVs. However, for viability, fast charging at this time scale needs to also occur at a price that is acceptable to consumers. Therefore, the cost drivers for both BEV owners and charging station providers are analyzed. In addition, key infrastructure considerations are examined, including grid stability and delivery of power, the design of fast charging stations and the design and use of electric vehicle service equipment. Each of these aspects have technical barriers that need to be addressed, and are directly linked to economic impacts to use and implementation. Here, this discussion focuses on both the economic and infrastructure issues which exist and need to be addressed for the effective implementation of fast charging up to 350 kW. In doing so, it has been found that there is a distinct need to effectively manage the intermittent, high power demand of fast charging, strategically plan infrastructure corridors, and to further understand the cost of operation of charging infrastructure and BEVs.
- Research Organization:
- Argonne National Lab. (ANL), Argonne, IL (United States); Idaho National Laboratory, Idaho Falls, ID (United States)
- Sponsoring Organization:
- USDOE; USDOE Office of Energy Efficiency and Renewable Energy (EERE), Vehicle Technologies Office (EE-3V)
- Grant/Contract Number:
- AC02-06CH11357; AC07-05ID14517; AC36-08GO28308
- OSTI ID:
- 1402072
- Alternate ID(s):
- OSTI ID: 1402501
OSTI ID: 1408692
OSTI ID: 1496298
- Report Number(s):
- INL/JOU--17-41459; 135370
- Journal Information:
- Journal of Power Sources, Journal Name: Journal of Power Sources Journal Issue: C Vol. 367; ISSN 0378-7753
- Publisher:
- ElsevierCopyright Statement
- Country of Publication:
- United States
- Language:
- English
Commercialization of Lithium Battery Technologies for Electric Vehicles
|
journal | June 2019 |
Challenges and opportunities towards fast-charging battery materials
|
journal | June 2019 |
In Situ Measurement of Lithium-Ion Cell Internal Temperatures during Extreme Fast Charging
|
journal | January 2019 |
Challenges of Fast Charging for Electric Vehicles and the Role of Red Phosphorous as Anode Material: Review
|
journal | October 2019 |
Electric Vehicle Fast Charging Needs in Cities and along Corridors
|
journal | June 2019 |
Similar Records
Enabling fast charging – Infrastructure and economic considerations
Enabling Fast Charging: A Technology Gap Assessment
Journal Article
·
Wed Nov 01 00:00:00 EDT 2017
· Journal of Power Sources
·
OSTI ID:1408692
Enabling Fast Charging: A Technology Gap Assessment
Technical Report
·
Sun Oct 01 00:00:00 EDT 2017
·
OSTI ID:1466683