FIRST BEAM TESTS OF THE APS MBA UPGRADE ORBIT FEEDBACK CONTROLLER

Conference ·
OSTI ID:1393938
The new orbit feedback system required for the APS multi-bend acromat (MBA) ring must meet challenging beam stability requirements. The AC stability requirement is to correct rms beam motion to 10 % the rms beam size at the insertion device source points from 0.01 to 1000 Hz. The vertical plane represents the biggest challenge for AC stability which is required to be 400 nm rms for a 4 micron vertical beam size. In addition long term drift over a period of 7 days is required to be 1 micron or less at insertion de- vice BPMs and 2 microns for arc bpms. We present test re- sults of theMBA prototype orbit feedback controller (FBC) in the APS storage ring. In this test, four insertion device BPMs were configured to send data to the FBC for process- ing into four fast corrector setpoints. The configuration of four bpms and four fast correctors creates a 4-bump and the configuration of fast correctors is similar to what will be implemented in the MBA ring. We report on performance benefits of increasing the sampling rate by a factor of 15 to 22.6 kHz over the existing APS orbit feedback system, lim- itations due to existing storage ring hardware and extrapo- lation to theMBA orbit feedback design. FBC architecture, signal flow and processing design will also be discussed.
Research Organization:
Argonne National Laboratory (ANL)
Sponsoring Organization:
U.S. Department of Energy (Office not specified)
DOE Contract Number:
AC02-06CH11357
OSTI ID:
1393938
Country of Publication:
United States
Language:
English

Similar Records

Beam Stability R&D for the APS MBA Upgrade
Conference · Wed Dec 31 23:00:00 EST 2014 · OSTI ID:1335915

Advances in orbit drift correction in the advanced photon source storage ring
Conference · Sun Jun 01 00:00:00 EDT 1997 · OSTI ID:491385

Commissioning results of the narrow-band beam position monitor system upgrade in the APS storage ring.
Conference · Tue Apr 20 00:00:00 EDT 1999 · OSTI ID:11144

Related Subjects