skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Optimal Black Start Resource Allocation

Journal Article · · IEEE Transactions on Power Systems

The restoration of the bulk power system after a partial or complete blackout relies on black-start (BS) resources. To prepare for system restoration, it is important to procure the right amount of BS resources at the right locations in the grid so that the total restoration time can be minimized. Achieving this goal requires that resource procurement planning takes the restoration process into account. In this study, we integrate the BS resource procurement decision with a restoration planning model and develop an optimization model that produces a minimal cost procurement plan that satisfies the restoration time requirement.

Research Organization:
Argonne National Lab. (ANL), Argonne, IL (United States)
Sponsoring Organization:
USDOE Office of Electricity Delivery and Energy Reliability
DOE Contract Number:
AC02-06CH11357
OSTI ID:
1391928
Journal Information:
IEEE Transactions on Power Systems, Vol. 31, Issue 3; ISSN 0885-8950
Publisher:
IEEE
Country of Publication:
United States
Language:
English

Similar Records

Optimal Black Start Allocation for Power System Restoration
Journal Article · Wed May 02 00:00:00 EDT 2018 · IEEE Transactions on Power Systems · OSTI ID:1391928

Formulations and Valid Inequalities for Optimal Black Start Allocation in Power Systems
Journal Article · Tue Jun 30 00:00:00 EDT 2020 · Operations Research · OSTI ID:1391928

Optimal Electric Grid Black Start Restoration Subject to Intentional Threats
Technical Report · Sat Oct 01 00:00:00 EDT 2022 · OSTI ID:1391928