Optimal Black Start Resource Allocation
Journal Article
·
· IEEE Transactions on Power Systems
The restoration of the bulk power system after a partial or complete blackout relies on black-start (BS) resources. To prepare for system restoration, it is important to procure the right amount of BS resources at the right locations in the grid so that the total restoration time can be minimized. Achieving this goal requires that resource procurement planning takes the restoration process into account. In this study, we integrate the BS resource procurement decision with a restoration planning model and develop an optimization model that produces a minimal cost procurement plan that satisfies the restoration time requirement.
- Research Organization:
- Argonne National Lab. (ANL), Argonne, IL (United States)
- Sponsoring Organization:
- USDOE Office of Electricity Delivery and Energy Reliability
- DOE Contract Number:
- AC02-06CH11357
- OSTI ID:
- 1391928
- Journal Information:
- IEEE Transactions on Power Systems, Vol. 31, Issue 3; ISSN 0885-8950
- Publisher:
- IEEE
- Country of Publication:
- United States
- Language:
- English
Similar Records
Optimal Black Start Allocation for Power System Restoration
Formulations and Valid Inequalities for Optimal Black Start Allocation in Power Systems
Optimal Electric Grid Black Start Restoration Subject to Intentional Threats
Journal Article
·
Wed May 02 00:00:00 EDT 2018
· IEEE Transactions on Power Systems
·
OSTI ID:1391928
+2 more
Formulations and Valid Inequalities for Optimal Black Start Allocation in Power Systems
Journal Article
·
Tue Jun 30 00:00:00 EDT 2020
· Operations Research
·
OSTI ID:1391928
+1 more
Optimal Electric Grid Black Start Restoration Subject to Intentional Threats
Technical Report
·
Sat Oct 01 00:00:00 EDT 2022
·
OSTI ID:1391928
+4 more