skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Sampling and Analysis Plan for Verification Sampling of LANL-Derived Residual Radionuclides in Soils within Tract A-18-2 for Land Conveyance

Abstract

Public Law 105-119 directs the U.S. Department of Energy (DOE) to convey or transfer parcels of land to the Incorporated County of Los Alamos or their designees and to the Department of Interior, Bureau of Indian Affairs, in trust for the Pueblo de San Ildefonso. Los Alamos National Security is tasked to support DOE in conveyance and/or transfer of identified land parcels no later than September 2022. Under DOE Order 458.1, Radiation Protection of the Public and the Environment (O458.1, 2013) and Los Alamos National Laboratory (LANL or the Laboratory) implementing Policy 412 (P412, 2014), real property with the potential to contain residual radioactive material must meet the criteria for clearance and release to the public. This Sampling and Analysis Plan (SAP) is a second investigation of Tract A-18-2 for the purpose of verifying the previous sampling results (LANL 2017). This sample plan requires 18 projectspecific soil samples for use in radiological clearance decisions consistent with LANL Procedure ENV-ES-TP-238 (2015a) and guidance in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM, 2000). The sampling work will be conducted by LANL, and samples will be evaluated by a LANL-contracted independent lab. However, there will be federal review (verification) of allmore » steps of the sampling process.« less

Authors:
 [1]
  1. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Publication Date:
Research Org.:
Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
1378909
Report Number(s):
LA-UR-17-27826
DOE Contract Number:  
AC52-06NA25396
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES; Environmental Protection

Citation Formats

Ruedig, Elizabeth. Sampling and Analysis Plan for Verification Sampling of LANL-Derived Residual Radionuclides in Soils within Tract A-18-2 for Land Conveyance. United States: N. p., 2017. Web. doi:10.2172/1378909.
Ruedig, Elizabeth. Sampling and Analysis Plan for Verification Sampling of LANL-Derived Residual Radionuclides in Soils within Tract A-18-2 for Land Conveyance. United States. doi:10.2172/1378909.
Ruedig, Elizabeth. Wed . "Sampling and Analysis Plan for Verification Sampling of LANL-Derived Residual Radionuclides in Soils within Tract A-18-2 for Land Conveyance". United States. doi:10.2172/1378909. https://www.osti.gov/servlets/purl/1378909.
@article{osti_1378909,
title = {Sampling and Analysis Plan for Verification Sampling of LANL-Derived Residual Radionuclides in Soils within Tract A-18-2 for Land Conveyance},
author = {Ruedig, Elizabeth},
abstractNote = {Public Law 105-119 directs the U.S. Department of Energy (DOE) to convey or transfer parcels of land to the Incorporated County of Los Alamos or their designees and to the Department of Interior, Bureau of Indian Affairs, in trust for the Pueblo de San Ildefonso. Los Alamos National Security is tasked to support DOE in conveyance and/or transfer of identified land parcels no later than September 2022. Under DOE Order 458.1, Radiation Protection of the Public and the Environment (O458.1, 2013) and Los Alamos National Laboratory (LANL or the Laboratory) implementing Policy 412 (P412, 2014), real property with the potential to contain residual radioactive material must meet the criteria for clearance and release to the public. This Sampling and Analysis Plan (SAP) is a second investigation of Tract A-18-2 for the purpose of verifying the previous sampling results (LANL 2017). This sample plan requires 18 projectspecific soil samples for use in radiological clearance decisions consistent with LANL Procedure ENV-ES-TP-238 (2015a) and guidance in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM, 2000). The sampling work will be conducted by LANL, and samples will be evaluated by a LANL-contracted independent lab. However, there will be federal review (verification) of all steps of the sampling process.},
doi = {10.2172/1378909},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2017},
month = {8}
}

Technical Report:

Save / Share: