skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Performance testing of a prototype Pd-Ag diffuser

Technical Report ·
DOI:https://doi.org/10.2172/1374360· OSTI ID:1374360
 [1];  [1]
  1. Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

The fusion fuel cycle has gained significant attention over the last decade as interest in fusion programs has increased. One of the critical components of the fusion process is the tritium fuel cycle. The tritium fuel cycle is designed to supply and recycle process tritium at a specific throughput rate. One of the most important processes within the tritium fuel cycle is the clean-up of the of the process tritium. This step will initially separate the hydrogen isotopes (H2, D2, and T2) from the rest of the process gas using Pd-Ag diffusers or permeators. The Pd-Ag diffuser is an integral component for any tritium purification system; whether part of the United States’ defense mission or fusion programs. Domestic manufacturers of Pd-Ag diffusers are extremely limited and only a few manufacturers exist. Johnson-Matthey (JM) Pd-Ag diffusers (permeators) have previously been evaluated for the separation of hydrogen isotopes from non-hydrogen gas species in the process. JM is no longer manufacturing Pd-Ag diffusers and a replacement vendor needs to be identified to support future needs. A prototype Pd-Ag diffuser has been manufactured by Power and Energy, and is considered a potential replacement for the JM diffuser for tritium service. New diffuser designs for a tritium facility for any fusion energy applications must be characterized by evaluating their operating envelope prior to installation in a tritium processing facility. The prototype Pd-Ag diffuser was characterized to determine the overall performance as a function of the permeation of hydrogen through the membrane. The tests described in this report consider the effects of feed gas compositions, feed flow rates, pump configuration and internal tube pressure on the permeation of H2 through the Pd-Ag tubes.

Research Organization:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC09-08SR22470
OSTI ID:
1374360
Report Number(s):
SRNL-STI-2016-00444; TRN: US1800489
Country of Publication:
United States
Language:
English

Similar Records

EFFECT OF IMPURITIES ON THE PERFORMANCE OF A Pd-Ag DIFFUSER
Journal Article · Thu Dec 16 00:00:00 EST 2010 · Tritium 2010 Proceedings, Special Issue of Fusion Science and Technology · OSTI ID:1374360

Testing of a 7-tube palladium membrane reactor for potential use in TEP
Conference · Fri Jan 01 00:00:00 EST 2010 · OSTI ID:1374360

Tritium permeability measurement in hydrogen-tritium system
Conference · Sun Apr 01 00:00:00 EDT 2018 · OSTI ID:1374360