Testing of the HP G-link chip set for an event builder application
Journal Article
·
· IEEE Transactions on Nuclear Science
- Fermi National Accelerator Lab., Batavia, IL (United States)
The Hewlett Packard HDMP-1000 G-Link transmitter and receiver chip set was tested for an event builder application. The re-lock time of the serial link when a data path is changed is less than 30 {micro}s provided fill frames are transmitted. With a 1 kHz data path switching rate, this results in less than a 3% data rate inefficiency due to re-synchronization, which makes the HP G-Link chip set effective for use in a large event builder for a hadron collider experiment.
- OSTI ID:
- 136921
- Report Number(s):
- CONF-941061--
- Journal Information:
- IEEE Transactions on Nuclear Science, Journal Name: IEEE Transactions on Nuclear Science Journal Issue: 4Pt1 Vol. 42; ISSN IETNAE; ISSN 0018-9499
- Country of Publication:
- United States
- Language:
- English
Similar Records
SBus G-Link transmitter and receiver modules for an event builder system
CMS DAQ event builder based on Gigabit Ethernet
Draft Specification Fiberoptic Data Transmission Link
Conference
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:513020
CMS DAQ event builder based on Gigabit Ethernet
Conference
·
Sun Apr 01 00:00:00 EDT 2007
·
OSTI ID:919586
Draft Specification Fiberoptic Data Transmission Link
Technical Report
·
Mon Apr 02 00:00:00 EDT 1990
·
OSTI ID:2568729