Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.

Technical Report ·
DOI:https://doi.org/10.2172/1367309· OSTI ID:1367309
 [1]
  1. Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Work Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.
Research Organization:
Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)
Sponsoring Organization:
USDOE Office of Environmental Management (EM)
DOE Contract Number:
AC04-94AL85000
OSTI ID:
1367309
Report Number(s):
SAND--2017-5387R; 653482
Country of Publication:
United States
Language:
English

Similar Records

Discharge Permit-1845 Quarterly Status Report (Jul-Sep 2017)
Technical Report · Sun Dec 31 23:00:00 EST 2017 · OSTI ID:1734456

Discharge Permit-1845 Quarterly Status Report October 2018
Technical Report · Mon Oct 01 00:00:00 EDT 2018 · OSTI ID:1481587

Revised Tijeras Arroyo Groundwater Current Conceptual Model and Corrective Measures Evaluation Report - February 2018.
Technical Report · Wed Jan 31 23:00:00 EST 2018 · OSTI ID:1420754

Related Subjects