Title: Brine Extraction and Treatment Strategies to Enhance Pressure Management and Control of CO2 Plumes in Deep Geologic Formations

Technical Report ·
DOI:https://doi.org/10.2172/1363792· OSTI ID:1363792
 [1];  [1];  [1]
  1. Univ. of Illinois, Champaign, IL (United States). Prairie Research Inst.

The overall goal of the this project is to develop and validate pressure management and carbon dioxide (CO2) plume control strategies that can address technical and economic barriers to commercial deployment of CO2 storage technologies, based on computational and field demonstration work at the Archer Daniels Midland Company (ADM) facility where the Illinois Basin–Decatur Project (IBDP) and the Illinois-Industrial Carbon Capture and Storage (IL-ICCS) projects are located. To accomplish the overall goal, the ISGS designed a brine extraction storage test (BEST) that could be completed in two phases. The goal of BEST Phase I was to evaluate the feasibilities of extraction well(s) placement, the brine extraction to CO2 injection rate ratio, extraction well completion, and brine treatment and handling. The goal of BEST Phase II would be to validate the brine extraction and treatment options deemed feasible in Phase I by (1) demonstrating the efficacy of brine extraction (BE) in managing pressure (i.e., formation) and the CO2 plume, and (2) demonstrating treatment of extracted brine with high total dissolved solids (TDS; >200,000 mg/L) using multiple advanced treatment technologies. This report details work done in Phase I. Several brine extraction and treatment scenarios were tested, simulated, and analyzed for their effectiveness in extracting brine. Initially a vertical well was studied; however, geologic modeling, reservoir modeling, and the existing facility and wellbore infrastructure dictated that the location of a vertical brine extraction well was limited to an area with no existing monitoring wells and where the well would be in relative proximity to an existing CO2 plume. Consequently, a vertical well was excluded, and a horizontal brine extraction well placed above the existing CO2 plume near two existing wells was studied. The horizontal well option allows the project to leverage the availability of cased-hole logs and cross-well tomography to monitor CO2 saturation and plume distribution, respectively. Because of the proximity of the horizontal well option to two existing wells, no additional monitoring well (or caprock penetration) is required. The recommended brine extraction pilot design options are (1) a horizontal extraction well at the base of the Middle Mt. Simon, which is 350–520 ft (107–158 m) above the CO2 plume at CCS#1 and VW#1; or (2) a vertical extraction well 0.5 mi (0.8 km) from CCS#2 in a direction approximately southeast of CCS#2, perpendicular to the direction of high hydraulic connectivity. A horizontal extraction well has advantages over a vertical extraction well, including less risk of drilling into an existing CO2 plume and it can be located between two other wells that can be used for monitoring. Thus, because the two existing wells can serve as monitoring wells, it eliminates the need for a third verification well and allows for a lower extraction rate to control the CO2 plume and pressure. Managing pressure and the CO2 plume distribution via brine extraction creates the obvious and important challenge of handling and treating the extracted brine. There were three options for brine disposal: (1) underground injection control (UIC) disposal well, (2) brine treatment and industrial use, and (3) brine pretreatment and discharge into municipal wastewater system. The primary design elements were budget and permitting requirements. The disposal well would be a vertical well drilled and completed into the Potosi Dolomite. For the range of extraction rates anticipated, the cost of this well is relatively constant. The cost of brine treatment is highly depends on the extraction rate, which depends on the well orientation. If relatively high rates are required, the vertical disposal well option is more favorable; for relatively lower rates, the two brine treatment options have lower costs. Life-cycle-analysis studies on extracted brine handling options suggest that a UIC well has a lower environmental impact than brine treatment. Both brine disposal options using brine treatment require removal of suspended solids from the extracted brine. The most suitable commercially available technology and the most promising emerging and innovative technology are recommended for implementation in Phase II. Though the challenges of this project are written specific to Decatur, every CO2 storage site considering the use of brine extraction integrated with CO2 storage will have similar, if not identical, technical and logistical challenges.

Research Organization:
Univ. of Illinois at Urbana-Champaign, IL (United States)
Sponsoring Organization:
USDOE Office of Fossil Energy (FE)
DOE Contract Number:
FE0026136
OSTI ID:
1363792
Report Number(s):
DOE-UOFI-FE0026136
Country of Publication:
United States
Language:
English