Title: DEVELOPMENT OF THE PRIEST RAPIDS TURBINE UPGRADE PROJECT

Conference ·
OSTI ID:1349991

The Priest Rapids Dam is located on the Columbia River and is operated by Public Utility District No. 2 of Grant County, WA (GCPUD). In operation since 1959, GCPUD decided that a major upgrade was necessary. As with other hydroelectric facilities on the Columbia River, improving fish passage at Priest Rapids Dam is of great importance for salmon and steelhead populations in the Pacific Northwest. Consequently, GCPUD established the Priest Rapids Turbine Upgrade Project to extend the life of the units, increase efficiency and power production, and improve fish-passage. The Priest Rapids powerhouse is equipped with 10 vertical Kaplan turbines with runner diameters of 7.21 m operating under net heads varying from 18 m to 27 m. The scope of the project included a design competition involving three turbine manufacturers providing up to two designs for evaluation. Selection of the replacement design was determined by the lowest evaluated price based on model test results conducted at an independent laboratory (Ecole Polytechnique Federale de Lausanne in Lausanne Switzerland) and a biological performance score determined by a newly developed Biological Performance Assessment (BioPA) performed by Pacific Northwest National Laboratory in Richland, WA. In the paper, the hydraulic design challenges are reviewed, in addition to comparisons of designs evaluated during the competitive model test program and biological assessment. The paper also provides a description of the process followed by GCPUD, and how the evaluation criteria influenced the development and the finally selected solution.

Research Organization:
Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-76RL01830
OSTI ID:
1349991
Report Number(s):
PNNL-SA-109851; WC0102000
Resource Relation:
Conference: HydroVision 2015, July 14-17, 2015, Portland, Oregon
Country of Publication:
United States
Language:
English

Similar Records

Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project
Conference · Tue Jun 25 00:00:00 EDT 2013 · OSTI ID:1349991

Computational Tools to Assess Turbine Biological Performance
Journal Article · Thu Jul 24 00:00:00 EDT 2014 · Hydro Review, 33(6) · OSTI ID:1349991

Quantifying Barotrauma Risk to Juvenile Fish during Hydro-turbine Passage
Journal Article · Sat Mar 15 00:00:00 EDT 2014 · Fisheries Research, 154(2014):152-164 · OSTI ID:1349991