External Events Analysis for LWRS/RISMC Project: Methodology Development and Early Demonstration
Conference
·
OSTI ID:1348078
- Idaho National Laboratory
The ultimate scope of Industrial Application #2 (IA) of the LWRS/RISMC project is a realistic simulation of natural external hazards that impose threat to a NPP. This scope requires the development of a methodology and of a qualified set of tools able to perform advanced risk- informed safety analysis. In particular the methodology should be able to combine results from seismic, flooding and thermal-hydraulic (TH) deterministic calculations with dynamic PRA. This summary presents the key points of methodology being developed and the very first sample application of it to a simple problem (spent fuel pool).
- Research Organization:
- Idaho National Laboratory (INL), Idaho Falls, ID (United States)
- Sponsoring Organization:
- USDOE Office of Nuclear Energy (NE)
- DOE Contract Number:
- AC07-05ID14517
- OSTI ID:
- 1348078
- Report Number(s):
- INL/CON-16-37839
- Country of Publication:
- United States
- Language:
- English
Similar Records
External Events Analysis for LWRS/RISMC Project: Methodology Development and Early Demonstration
PWR Station Blackout and External Events Analysis for LWRS/RISMC Project
Uncertainty Quantification for External Events Analysis of LWRS/RISMC Project
Journal Article
·
Wed Jun 15 00:00:00 EDT 2016
· Transactions of the American Nuclear Society
·
OSTI ID:22991956
PWR Station Blackout and External Events Analysis for LWRS/RISMC Project
Journal Article
·
Fri Jul 01 00:00:00 EDT 2016
· Transactions of the American Nuclear Society
·
OSTI ID:23042738
Uncertainty Quantification for External Events Analysis of LWRS/RISMC Project
Journal Article
·
Sat Jul 01 00:00:00 EDT 2017
· Transactions of the American Nuclear Society
·
OSTI ID:23050258