Parallel-in-time methods for power grid problems with generator and load ramping
- Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)
The objective of this technical memo is to describe the different methods that have been implemented and tested regarding the use of the MGRIT algorithm for generator and load ramping problems.
- Research Organization:
- Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC52-07NA27344
- OSTI ID:
- 1347676
- Report Number(s):
- LLNL-TR-726798
- Country of Publication:
- United States
- Language:
- English
Similar Records
A parallel-in-time algorithm for variable step multistep methods
Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations
Parallel Time Integration for Constrained Optimization
Journal Article
·
Fri Sep 27 00:00:00 EDT 2019
· Journal of Computational Science
·
OSTI ID:1347676
Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations
Technical Report
·
Wed Sep 01 00:00:00 EDT 2010
·
OSTI ID:1347676
+4 more
Parallel Time Integration for Constrained Optimization
Technical Report
·
Wed Aug 19 00:00:00 EDT 2020
·
OSTI ID:1347676
+1 more