Final Report for the Restart of the Waste Characterization, Reduction and Repackaging Facility (WCRRF) Contractor Readiness Assessment (CRA)
- Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
The Los Alamos National Laboratory (LANL or Laboratory) Contractor Readiness Assessment (CRA) required for restart of the Technical Area (TA) 50 Waste Characterization, Reduction, and Repackaging Facility (WCRRF) for remediated nitrate salt (RNS) waste operations was performed in compliance with the requirements of Department of Energy (DOE) Order (O) 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities, and LANL procedure FSD-115-001, Verification of Readiness to Start Up or Restart LANL Nuclear Facilities, Activities, and Operations.
- Research Organization:
- Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Management (EM)
- DOE Contract Number:
- AC52-06NA25396
- OSTI ID:
- 1345129
- Report Number(s):
- LA--UR-17-21397
- Country of Publication:
- United States
- Language:
- English
Similar Records
Final Report for the Contractor Readiness Assessment of the Transient Reactor Test Facility Resumption of Transient Testing Activity at the Idaho National Laboratory
Department of Energy Operational Readiness Review for the Waste Isolation Pilot Plant
Final Report: Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation
Technical Report
·
Thu Jun 01 00:00:00 EDT 2017
·
OSTI ID:1468428
Department of Energy Operational Readiness Review for the Waste Isolation Pilot Plant
Technical Report
·
Wed Nov 30 23:00:00 EST 2016
·
OSTI ID:1437114
Final Report: Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation
Technical Report
·
Mon Jun 01 00:00:00 EDT 2015
·
OSTI ID:1244618