Impacts of Inverter-Based Advanced Grid Support Functions on Islanding Detection
A long-standing requirement for inverters paired with distributed energy resources is that they are required to disconnect from the electrical power system (EPS) when an electrical island is formed. In recent years, advanced grid support controls have been developed for inverters to provide voltage and frequency support by integrating functions such as voltage and frequency ride-through, volt-VAr control, and frequency-Watt control. With these new capabilities integrated into the inverter, additional examination is needed to determine how voltage and frequency support will impact pre-existing inverter functions like island detection. This paper inspects how advanced inverter functions will impact its ability to detect the formation of an electrical island. Results are presented for the unintentional islanding laboratory tests of three common residential-scale photovoltaic inverters performing various combinations of grid support functions. For the inverters tested, grid support functions prolonged island disconnection times slightly; however, it was found that in all scenarios the inverters disconnected well within two seconds, the limit imposed by IEEE Std 1547-2003.
- Research Organization:
- National Renewable Energy Lab. (NREL), Golden, CO (United States)
- Sponsoring Organization:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE), Renewable Power Office. Solar Energy Technologies Office
- DOE Contract Number:
- AC36-08GO28308
- OSTI ID:
- 1344442
- Report Number(s):
- NREL/CP-5D00-66075
- Resource Relation:
- Conference: Presented at the 2016 IEEE Power and Energy Society Innovative Smart Grid Technologies Conference (ISGT), 6-9 September 2016, Minneapolis, Minnesota
- Country of Publication:
- United States
- Language:
- English