Beam Position Monitor and Energy Analysis at the Fermilab Accelerator Science and Technology Facility
- Univ. of Guanajuato (Mexico)
Fermilab Accelerator Science and Technology Facility has produced its first beam with an energy of 20 MeV. This energy is obtained by the acceleration at the Electron Gun and the Capture Cavity 2 (CC2). When fully completed, the accelerator will consist of a photoinjector, one International Liner Collider (ILC)-type cryomodule, multiple accelerator R&D beamlines, and a downstream beamline to inject 300 MeV electrons into the Integrable Optics Test Accelerator (IOTA). We calculated the total energy of the beam and the corresponding energy to the Electron Gun and CC2. Subsequently, a Beam Position Monitors (BPM) error analysis was done, to calculate the device actual resolution.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1342208
- Report Number(s):
- FERMILAB-MASTERS--2015-08; 1510362
- Country of Publication:
- United States
- Language:
- English
Similar Records
First Beam and High-Gradient Cryomodule Commissioning Results of the Advanced Superconducting Test Accelerator at Fermilab
Plans for a 750 MeV electron beam test facility at Fermilab
Status and Plans for an SRF Accelerator Test Facility at Fermilab
Conference
·
Sun May 31 20:00:00 EDT 2015
· No journal information
·
OSTI ID:1250809
Plans for a 750 MeV electron beam test facility at Fermilab
Conference
·
Fri Jun 01 00:00:00 EDT 2007
· Conf.Proc.C070625:2942,2007
·
OSTI ID:922034
Status and Plans for an SRF Accelerator Test Facility at Fermilab
Conference
·
Fri Jul 29 00:00:00 EDT 2011
·
OSTI ID:1021487