Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype

Technical Report ·
DOI:https://doi.org/10.2172/1331492· OSTI ID:1331492
 [1];  [1];  [1];  [1];  [1];  [1];  [2]
  1. Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis
  2. Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). High Confidence System Environments
The reports and test plans contained within this document serve as supporting materials to the activities listed within the “Contingency Contractor Optimization Tool – Prototype (CCOT-P) Verification & Validation Plan” [1]. The activities included test development, testing, peer reviews, and expert reviews. The engineering prototype reviews were done for both the software and the mathematical model used in CCOT-P. Section 2 includes the peer and expert review reports, which summarize the findings from each of the reviews and document the resolution of any issues. Section 3 details the test plans that were followed for functional testing of the application through the interface. Section 4 describes the unit tests that were run on the code.
Research Organization:
Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC04-94AL85000
OSTI ID:
1331492
Report Number(s):
SAND2016-3553; 638404
Country of Publication:
United States
Language:
English