Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Radwaste (DAW) volume reduction cost initiative at the Oyster Creek Nuclear Generation Station

Technical Report ·
OSTI ID:133047
 [1]
  1. GPU Nuclear Corporation, Forked River, NJ (United States)
Oyster Creek Nuclear Generating Station is a General Electric Mark 1, 620 MWe (Net) Boiling Water Reactor operated by GPU Nuclear Corporation and located in Forked River, New Jersey. The plant began commercial operation on December 23, 1969, and achieved its longest continuous run during cycle 14 (413 days) 2-16-93 to 9-11-94. As part of the industry-wide initiative to reduce nuclear plant O&M costs, the Electric Power Research Institute (EPRI) was asked by GPU Nuclear to assist the Oyster Creek Nuclear Generating Station (OCNGS) in identifying opportunities for reducing the costs associated with its Radwaste Minimization Program for Dry Active Waste (DAW). The purpose of the project was to evaluate the existing generation, minimization, processing and disposal programs and to identify a wide variety of potential mechanisms for reducing waste volumes and associated costs.
Research Organization:
Electric Power Research Inst., Palo Alto, CA (United States); Williams (Paul) and Associates, Medina, OH (United States)
OSTI ID:
133047
Report Number(s):
EPRI-TR--105134; CONF-940746--
Country of Publication:
United States
Language:
English