Tube structural integrity evaluation of Palo Verde Unit 1 steam generators for axial upper-bundle cracking
Book
·
OSTI ID:131839
- Packer Engineering Plant Component Analysis Division, Pittsburgh, PA (United States)
- Arizona Public Service, Phoenix, AZ (United States)
The analysis of the issue of upper bundle axial ODSCC as it apples to steam generator tube structural integrity in Unit 1 at the Palo Verde Nuclear generating Station is presented in this study. Based on past inspection results for Units 2 and 3 at Palo Verde, the detection of secondary side stress corrosion cracks in the upper bundle region of Unit 1 may occur at some future date. The following discussion provides a description and analysis of the probability of axial ODSCC in Unit 1 leading to the exceedance of Regulatory Guide 1.121 structural limits. The probabilities of structural limit exceedance are estimated as function of run time using a conservative approach. The chosen approach models the historical development of cracks, crack growth, detection of cracks and subsequent removal from service and the initiation and growth of new cracks during a given cycle of operation. Past performance of all Palo Verde Units as well as the historical performance of other steam generators was considered in the development of cracking statistics for application to Unit 1. Data in the literature and Unit 2 pulled tube examination results were used to construct probability of detection curves for the detection of axial IGSCC/IGA using an MRPC (multi-frequency rotating panake coil) eddy current probe. Crack growth rates were estimated from Unit 2 eddy current inspection data combined with pulled tube examination results and data in the literature. A Monte-Carlo probabilistic model is developed to provide an overall assessment of the risk of Regulatory Guide exceedance during plant operation.
- OSTI ID:
- 131839
- Report Number(s):
- CONF-950740--; ISBN 0-7918-1334-7
- Country of Publication:
- United States
- Language:
- English
Similar Records
Probabilistic analysis for axial cracking in Palo Verde Unit 1 steam generator tubing
Corrosion of Palo Verde 2 upper bundle steam generator tubing
Robotic inspection confirms steam generator modification plan
Conference
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:203765
Corrosion of Palo Verde 2 upper bundle steam generator tubing
Book
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:203822
Robotic inspection confirms steam generator modification plan
Journal Article
·
Fri Sep 01 00:00:00 EDT 1995
· Power Engineering (Barrington)
·
OSTI ID:113288