Progress Towards Doubling the Beam Power at Fermilab's Accelerator Complex
Conference
·
OSTI ID:1296919
- Fermilab
After a 16 month shutdown to reconfigure the Fermilab Accelerators for high power operations, the Fermilab Accelerator Complex is again providing beams for numerous Physics Experiments. By using the Recycler to slip stack protons while the Main Injector is ramping, the beam power at 120 GeV can reach 700 KW, a factor of 2 increase. The progress towards doubling the Fermilab's Accelerator complex beam power will be presented.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1296919
- Report Number(s):
- FERMILAB-CONF-14-187-AD; 1314160
- Country of Publication:
- United States
- Language:
- English
Similar Records
A new slip stacking RF system for a twofold power upgrade of Fermilab's Accelerator Complex
Simulations of the Fermilab Recycler for Losses and Collimation
Beam intensity upgrade at Fermilab
Journal Article
·
Thu May 15 00:00:00 EDT 2014
· Nuclear Instruments and Methods in Physics Research. Section A, Accelerators, Spectrometers, Detectors and Associated Equipment
·
OSTI ID:1296596
Simulations of the Fermilab Recycler for Losses and Collimation
Conference
·
Mon Jun 01 00:00:00 EDT 2015
·
OSTI ID:1250805
Beam intensity upgrade at Fermilab
Conference
·
Sat Jul 01 00:00:00 EDT 2006
·
OSTI ID:897059