Status of the PXIE Low Energy Beam Transport Line
- Fermilab
- University Coll. London
A CW-compatible, pulsed H- superconducting RF linac (a.k.a. PIP-II) is envisaged as a possible path for upgrading Fermilab’s injection complex [1]. To validate the concept of the front-end of such machine, a test accelerator (a.k.a. PXIE) [2] is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a MEBT that feeds the first cryomodule. In addition to operating in the nominal CW mode, the LEBT should be able to produce a pulsed beam for both PXIE commissioning and modelling of the front-end nominal operation in the pulsed mode. Concurrently, it needs to provide effective means of inhibiting beam as part of the overall machine protection system. A peculiar feature of the present LEBT design is the capability of using the ~1m-long section immediately preceding the RFQ in two regimes of beam transport dynamics: neutralized and space charge dominated. This paper introduces the PXIE LEBT, reports on the status of the ion source and LEBT installation, and presents the first beam measurements.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1296916
- Report Number(s):
- FERMILAB-CONF-14-090-AD; 1314147
- Resource Relation:
- Conference: 5th International Particle Accelerator Conference, Dresden, Germany, 06/16-06/20/2014
- Country of Publication:
- United States
- Language:
- English
Similar Records
Installation Progress at the PIP-II Injector Test at Fermilab
PIP-II Injector Test: Challenges and Status