Quality Assurance Program Plan Failed Fuel Mockup Test Strand (LMFBR Program)
- Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
A Quality Assurance Program Plan is presented for use by the Reactor Division of the Oak Ridge National Laboratory in the design, construction, and operation of the Failed Fuel Mockup Test Stand in support of the Liquid Metal Fast Breeder Reactor Program. The Quality Assurance Program Plan sets forth requirements, policies, and procedures for planning, managing, conducting, and evaluating processes, structures, components, and systems. Quality Assurance Procedures covering Management and Planning, Design and Development, Procurement, Fabrication and Assembly, Installation, Operation, Maintenance, Modifications and Audit are included. These procedures are based on proven practices at ORNL. Implementation of these procedures provides the means of control and verification whereby those responsible for project management can assure that the quality required for safe, reliable, and economical operation will be achieved.
- Research Organization:
- Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
- Sponsoring Organization:
- USDOE; US Atomic Energy Commission (AEC)
- DOE Contract Number:
- AC05-00OR22725
- OSTI ID:
- 12783086
- Report Number(s):
- ORNL-TM--2884
- Country of Publication:
- United States
- Language:
- English
Similar Records
Quality assurance program requirements, Amendment 5 (9-26-79) to August 1973 issue
Quality assurance program requirements for nuclear power plants
Quality-Assurance Program Plan
Technical Report
·
Mon Dec 03 23:00:00 EST 1979
·
OSTI ID:5688306
Quality assurance program requirements for nuclear power plants
Book
·
Sun Dec 31 23:00:00 EST 1978
·
OSTI ID:5047065
Quality-Assurance Program Plan
Technical Report
·
Fri May 01 00:00:00 EDT 1981
·
OSTI ID:59730
Related Subjects
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS
Audit
Calibration
Change Control
Codes
DC - 80 - General Reactor Technology
Designee
Documentation
Evaluation
Inspections and Tests
Material Identification
Nonconformance
Procedures
Project Engineer
Qualified Personnel
Quality Assurance Levels
Records
Responsibility and Authority
Review
Standards and Specifications
Audit
Calibration
Change Control
Codes
DC - 80 - General Reactor Technology
Designee
Documentation
Evaluation
Inspections and Tests
Material Identification
Nonconformance
Procedures
Project Engineer
Qualified Personnel
Quality Assurance Levels
Records
Responsibility and Authority
Review
Standards and Specifications