Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Parallel computation of Steiner Minimal Trees

Conference ·
OSTI ID:125514
 [1]
  1. Univ. of Nevada, Reno, NV (United States)

Given a set of N cities, construct a connected network which has minimum length. The problem is simple enough, but the catch is that you are allowed to add junctions in your network. Therefore the problem becomes how many extra junctions should be added, and where should they be placed so as to minimize the overall network length. This intriguing optimization problem is known as the Steiner Minimal Tree Problem (SMT), where the junctions that are added to the network are called Steiner Points. The focus of this paper is the parallel computation for the generation of what Pawel Winter termed T-list and its implementation. This generation of T-list is followed by the extraction of the proper answer. When Winter developed his algorithm, the time for extraction dominated the overall computation time. After Cockayne and Hewgill`s work, the time to generate T-list dominated the overall computation time. The ideas we present were implemented in a program called PARSTEINER94, and the results show that the time to generate T-list has now been cut by an order of magnitude. So now the extraction time once again dominates the overall computation time.

OSTI ID:
125514
Report Number(s):
CONF-950212--
Country of Publication:
United States
Language:
English

Similar Records

The shortest-network problem
Journal Article · Sat Dec 31 23:00:00 EST 1988 · Scientific American; (USA) · OSTI ID:6845773

On-line generalized Steiner problem
Conference · Mon Dec 30 23:00:00 EST 1996 · OSTI ID:416787

Improving Steiner trees of a network under multiple constraints
Conference · Mon Jul 01 00:00:00 EDT 1996 · OSTI ID:251414