Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Wakefield and Beam Centering Measurements of a Damped and Detuned X-Band Accelerator Structure

Technical Report ·
DOI:https://doi.org/10.2172/12471· OSTI ID:12471
In the Next Linear Collider (NLC) design, X-Band (11.4 GHz) accelerator structures are used to accelerate multibunch beams to several hundred GeV. Although these structures allow for high gradient operation, their strong deflecting modes impose a number of operational constraints. In particular, the long-range transverse wakefields generated by the bunches need to be reduced by about two orders of magnitude to prevent significant beam breakup. During the past five years, a reduction scheme that employs both detuning and damping of the structure dipole modes has been developed to meet this requirement. Several prototype Damped and Detuned Structures (DDS) have been built to test and refine this scheme. The wakefield of the latest version, DDS3, has recently been measured in the Accelerator Structure Setup (ASSET) facility at SLAC. In this paper, we present these results together with predictions based on an equivalent circuit model of the structure. We also present ASSET studies in which the beam-induced dipole signals that are coupled out for damping purposes are used to center the beam in the structure.
Research Organization:
Stanford Linear Accelerator Center, Menlo Park, CA (US)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC03-76SF00515
OSTI ID:
12471
Report Number(s):
SLAC-PUB-8174
Country of Publication:
United States
Language:
English

Similar Records

Multibunch beam break-up in detuned structures
Conference · Sat May 01 00:00:00 EDT 1993 · OSTI ID:10187776

Microwave analysis of the damped detuned accelerator structure
Conference · Sun Sep 01 00:00:00 EDT 1996 · OSTI ID:486185

A damped detuned structure for the next linear collider
Conference · Sun Sep 01 00:00:00 EDT 1996 · OSTI ID:486184