Salt Creek CO{sub 2} enhanced oil recovery (EOR) project
Conference
·
OSTI ID:124653
- Mobil Exploration and Producing US, Inc., Midland, TX (United States)
Mobil began CO{sub 2} injection into the Salt Creek Field Unit in October, 1993. The CO{sub 2} processing plant was started up in stages, beginning in December, 1993, with all processing units in operation by June, 1994. The CO{sub 2} separation plant is designed to process 75 MMscfd inlet gas initially, with the capability of expanding to 110 MMscfd. The plant consists of inlet compression, a refrigeration system, membranes for bulk CO{sub 2} removal, an amine system, reinjection compressors, and a CO{sub 2} pumping station. A Honeywell TDC-3000 DCS system controls the plant. After CO{sub 2} and H{sub 2}S removal, the sweet hydrocarbon product is processed at the existing NGL refrigeration facility. This paper presents a process overview for the CO{sub 2} project facilities, and reviews some of the start-up planing and experiences that were encountered.
- OSTI ID:
- 124653
- Report Number(s):
- CONF-9503132--
- Country of Publication:
- United States
- Language:
- English
Similar Records
Brady Plant treating project
H[sub 2]S in EOR--1: Gas processing for CO[sub 2] EOR involves sulfur removal
Gas plant converts amine unit to MDEA-based solvent
Conference
·
Thu Jul 01 00:00:00 EDT 1999
·
OSTI ID:20000890
H[sub 2]S in EOR--1: Gas processing for CO[sub 2] EOR involves sulfur removal
Journal Article
·
Sun Nov 14 23:00:00 EST 1993
· Oil and Gas Journal; (United States)
·
OSTI ID:5752024
Gas plant converts amine unit to MDEA-based solvent
Journal Article
·
Thu Oct 01 00:00:00 EDT 1992
· Hydrocarbon Processing; (United States)
·
OSTI ID:7190671