Wellbore Trajectories into the Phase II Reservoir
- Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
In order to establish a new deep HDR-system in the crystalline rockmass below Fenton Hill, new holes into the reservoirs created in the hydraulic tests 2032 and 2042 have been proposed. A decision to drill a new wellbore into one of these two reservoirs was made in summer of 1984. At this time it was decided by the HDR program management to restrict the planning of the new wellbores to trajectories out of the existing wells EE-1, GT-2 or EE-3 in order to avoid excessive costs.
- Research Organization:
- Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC52-06NA25396
- OSTI ID:
- 1244335
- Report Number(s):
- LA-UR--15-29043-02
- Country of Publication:
- United States
- Language:
- English
Similar Records
Wellbore interference in fractured media
Repair, sidetrack, drilling, and completion of EE-2A for Phase 2 reservoir production service
Redrilling of well EE-3 at the Los Alamos National Laboratory HDR (Hot Dry Rock) project
Conference
·
Thu Dec 31 23:00:00 EST 1987
·
OSTI ID:887236
Repair, sidetrack, drilling, and completion of EE-2A for Phase 2 reservoir production service
Technical Report
·
Tue Aug 01 00:00:00 EDT 1989
·
OSTI ID:5999600
Redrilling of well EE-3 at the Los Alamos National Laboratory HDR (Hot Dry Rock) project
Conference
·
Wed Dec 31 23:00:00 EST 1986
·
OSTI ID:6239509