TVA`s Cumberland Units 1&2 SO{sub 2} removal system - an update
Technical Report
·
OSTI ID:123427
- Tennessee Valley Authority, Chattanooga, TN (United States)
- Raytheon Engineers & Constructors, Philadelphia, PA (United States)
- ABB Environmental Systems, Birmingham, AL (United States)
Tennessee Valley Authority`s Cumberland Fossil Plant (CUF) is a Phase I facility listed under the 1990 CAA Amendments. Units 1 & 2 are two 1300 MWe coal fired units which presently bum an eastern bituminous coal containing approximately 2.8% sulfur. The Flue Gas Desulfurization (FGD) system reduces sulfur dioxide (SO{sub 2}) emissions from Units 1 and 2 by means of wet limestone - forced oxidation scrubbing. The absorber modules were provided by ABB Environmental Systems (ABBES) with balance of plant engineering, construction management, and startup provided by Raytheon Engineers and Constructors (RE&C) under a partnership arrangement with TVA. The FGD systems for Unit 1 & 2 were brought on-line October 12, 1994 and December 14, 1994, respectively. This paper will present a brief description of the overall project, the design basis, challenging problems and solutions during construction and initial startup. Specific topics will include: (1) Optimization studies underway; (2) Unique design aspects of the facility; (3) A description of the absorber and supporting systems including the limestone barge unloader, ball mill system for reagent preparation, and draft system upgrades; and (4) Experience gained in management of a large project under the unique partnership agreement.
- Research Organization:
- Electric Power Research Inst., Palo Alto, CA (United States)
- OSTI ID:
- 123427
- Report Number(s):
- EPRI-TR--105258-Vol.2; CONF-950332--Vol.2
- Country of Publication:
- United States
- Language:
- English
Similar Records
SO sub 2 compliance Cumberland Fossil Plant
SO{sub 2} compliance Cumberland Fossil Plant. Final environmental assessment
Construction and startup experience for the Milliken FGD retrofit project
Technical Report
·
Thu Aug 01 00:00:00 EDT 1991
·
OSTI ID:5062514
SO{sub 2} compliance Cumberland Fossil Plant. Final environmental assessment
Technical Report
·
Thu Aug 01 00:00:00 EDT 1991
·
OSTI ID:10158186
Construction and startup experience for the Milliken FGD retrofit project
Conference
·
Tue Oct 01 00:00:00 EDT 1996
·
OSTI ID:376108