Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Testing actinide fission yield treatment in CINDER90 for use in MCNP6 burnup calculations

Journal Article · · Progress in Nuclear Energy
 [1];  [1]
  1. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Most of the development of the MCNPX/6 burnup capability focused on features that were applied to the Boltzman transport or used to prepare coefficients for use in CINDER90, with little change to CINDER90 or the CINDER90 data. Though a scheme exists for best solving the coupled Boltzman and Bateman equations, the most significant approximation is that the employed nuclear data are correct and complete. Thus, the CINDER90 library file contains 60 different actinide fission yields encompassing 36 fissionable actinides (thermal, fast, high energy and spontaneous fission). Fission reaction data exists for more than 60 actinides and as a result, fission yield data must be approximated for actinides that do not possess fission yield information. Several types of approximations are used for estimating fission yields for actinides which do not possess explicit fission yield data. The objective of this study is to test whether or not certain approximations of fission yield selection have any impact on predictability of major actinides and fission products. Further we assess which other fission products, available in MCNP6 Tier 3, result in the largest difference in production. Because the CINDER90 library file is in ASCII format and therefore easily amendable, we assess reasons for choosing, as well as compare actinide and major fission product prediction for the H. B. Robinson benchmark for, three separate fission yield selection methods: (1) the current CINDER90 library file method (Base); (2) the element method (Element); and (3) the isobar method (Isobar). Results show that the three methods tested result in similar prediction of major actinides, Tc-99 and Cs-137; however, certain fission products resulted in significantly different production depending on the method of choice.
Research Organization:
Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
Sponsoring Organization:
USDOE
Grant/Contract Number:
AC52-06NA25396
OSTI ID:
1227718
Report Number(s):
LA-UR--15-21831; PII: S0149197015300664
Journal Information:
Progress in Nuclear Energy, Journal Name: Progress in Nuclear Energy Journal Issue: C Vol. 85; ISSN 0149-1970
Publisher:
ElsevierCopyright Statement
Country of Publication:
United States
Language:
English

Similar Records

Testing the Delayed Gamma Capability in MCNP6 - Paper 86
Conference · Mon Sep 15 00:00:00 EDT 2014 · OSTI ID:23082915

MCNP6 enhancements of delayed-particle production
Conference · Sun Jul 01 00:00:00 EDT 2012 · OSTI ID:22105836

CINDER90 and CINDER2008 Comparison for Second Target Station Analysis
Technical Report · Sun May 01 00:00:00 EDT 2022 · OSTI ID:2224212