Water hammer simulator
Conference
·
OSTI ID:122570
- Consolidated Edison Co. of New York, Inc., New York, NY (United States)
The Consolidated Edison Company of New York, Inc. (Con Edison) has constructed a first-of-a-kind water hammer events simulator for use at its training center. The Learning Center, Con Edison`s central training facility, intends to use the simulator as an educational tool to demonstrate the various mechanisms of the water hammer phenomenon to power plant designers, engineers and operators. The water hammer phenomenon has been studied extensively for the past 15 years for the nuclear industry. However, the acknowledge of the various water hammer mechanisms and the measures to prevent or mitigate water hammer have not been widely disseminated among the operators of fossil-fueled power plants. Con Edison personnel who operate the various generation stations and the New York City steam distribution systems are expected to benefit from the new simulator. Knowledge gained from interacting with the simulator will be very important in helping the Con Edison prevent, mitigate, or accommodate water hammer at its facilities. The water hammer simulator was fabricated in Con Edison`s central machine shop. Details of the design and construction of the simulator were finalized in consultation with Creare, Inc., an engineering research firm, located in Hanover, New Hampshire. The simulator seeks to recreate the essential features of water hammer in steam mines following the buildup of cold (subcooled) water by condensation and steam-water interaction. This paper describes the fabrication, design, testing, and operation of the Con Edison water hammer simulator. A discussion of how Con Edison plans to use the facility at The Learning Center is included.
- OSTI ID:
- 122570
- Report Number(s):
- CONF-950740--; ISBN 0-7918-1349-5
- Country of Publication:
- United States
- Language:
- English
Similar Records
Prevention and mitigation of steam generator water hammer events in PWRs
Steam bubble collapse, water hammer and piping network response. Volume I. Steam bubble collapse and water hammer in piping systems: experiments and analysis. Final report
Prevention and mitigation of steam-generator water-hammer events in PWR plants
Journal Article
·
· Nucl. Saf.; (United States)
·
OSTI ID:5967685
Steam bubble collapse, water hammer and piping network response. Volume I. Steam bubble collapse and water hammer in piping systems: experiments and analysis. Final report
Technical Report
·
Sun Jun 01 00:00:00 EDT 1980
·
OSTI ID:5416565
Prevention and mitigation of steam-generator water-hammer events in PWR plants
Technical Report
·
Sun Oct 31 23:00:00 EST 1982
·
OSTI ID:6669377