Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

HPC - Facilities Penta

Technical Report ·
DOI:https://doi.org/10.2172/1223175· OSTI ID:1223175
 [1]
  1. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Strategy, Planning, Acquiring- very large scale computing require very large physical infrastructures, pipes, pumps, power, etc. Planning and acquiring $25M+ infrastructure projects and bringing in more power to the county takes a lot of long lead time / planning. Integration- New physical infrastructure must be integrated into our buildings, with the LANL site power and water systems, with existing infrastructure, and with the machines. Very large physical infrastructure projects are necessary. Management and Utilization – Ongoing operations, monitoring, maintenance, and trouble shooting of the physical infrastructure is required.
Research Organization:
Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC52-06NA25396
OSTI ID:
1223175
Report Number(s):
LA-UR--15-27870
Country of Publication:
United States
Language:
English

Similar Records

HPC - Platforms Penta Chart
Technical Report · Thu Oct 08 00:00:00 EDT 2015 · OSTI ID:1223174

Distribution Integrity Management Plan (DIMP): Los Alamos National Laboratory Natural Gas Distribution System
Technical Report · Sun May 06 20:00:00 EDT 2012 · OSTI ID:1040024

Technical manual description, operation, and maintenance procedures for Spinner and High Onset Facilities
Technical Report · Thu Oct 31 23:00:00 EST 1985 · OSTI ID:6051521