Conceptual Design Report: Fermilab Upgrade. Main Injector. Technical Components and Civil Construction, January, 1989

Technical Report ·
DOI:https://doi.org/10.2172/1221252· OSTI ID:1221252
This report contains a description of the design and cost estimate of a new 150 GeV accelerator, designated the Main Injector, which will be required to support the upgrade of the Fermilab Collider. The construction of this accelerator will simultaneously result in significant enhancements to the Fermilab fixed target program. The Main Injector (MI) is to be located south of the Antiproton Source and tangent to the Tevatron ring at the FO straight section as shown in Figure 1-1. The MI will perform all duties currently required of the existing Main Ring. Thus, operation of the Main Ring will cease following commissioning of the MI, with a concurrent reduction in background rates as seen in the colliding beam detectors. The performance of the MI, as measured in terms of protons per second delivered to the antiproton production target or total protons delivered to the Tevatron, is expected to exceed that of the Main Ring by a factor of two to three. In addition the MI will provide high duty factor 120 GeV beam to the experimental areas during collider operation, a capability which does not presently exist in the Main Ring.
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1221252
Report Number(s):
Project No. 91--CH-400
Country of Publication:
United States
Language:
English

Similar Records

Conceptual Design Report: Fermilab Upgrade: Main Injector - Technical Components and Civil Construction, January 1990 (Rev. 2)
Technical Report · Tue Jan 09 23:00:00 EST 1990 · OSTI ID:1223809

Conceptual Design Report: Fermilab Main Injector - Technical Components and Civil Construction, April 1992 (Rev. 3.1)
Technical Report · Tue Mar 31 23:00:00 EST 1992 · OSTI ID:1221257

The Fermilab main injector
Conference · Tue Aug 01 00:00:00 EDT 1989 · OSTI ID:5824079

Related Subjects