skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Recommendations on the Nature and Level of U.S. Participation in the International Thermonuclear Experimental Reactor Extension of the Experimental Reactor Extension of the Engineering Design Activities. Panel Report To Fusion Energy Sciences Advisory Committee (FESAC)

Technical Report ·
DOI:https://doi.org/10.2172/1206548· OSTI ID:1206548

The DOE Office of Energy Research chartered through the Fusion Energy Sciences Advisory Committee (FESAC) a panel to "address the topic of U. S. participation in an ITER construction phase, assuming the ITER Parties decide to proceed with construction." (Attachment 1: DOE Charge, September 1996). Given that there is expected to be a transition period of three to five years between the conclusion of the Engineering Design Activities (EDA) and the possible construction start, the DOE Office of Energy Research expanded the charge to "include the U.S. role in an interim period between the EDA and construction." (Attachment 2: DOE Expanded Charge, May 1997). This panel has heard presentations and received input from a wide cross-section of parties with an interest in the fusion program. The panel concluded it could best fulfill its responsibility under this charge by considering the fusion energy science and technology portion of the U.S. program in its entirety. Accordingly, the panel is making some recommendations for optimum use of the transition period considering the goals of the fusion program and budget pressures.

Research Organization:
USDOE Office of Science (SC), Washington, DC (United States). Fusion Energy Sciences Advisory Committee (FESAC)
Sponsoring Organization:
USDOE Office of Science (SC), Fusion Energy Sciences (FES)
OSTI ID:
1206548
Report Number(s):
DOE/ER-0720; TRN: US1500819
Country of Publication:
United States
Language:
English