The status of the D-Zero silicon tracker upgrade project
Conference
·
OSTI ID:11973
- Fermilab
The current status of the silicon tracker for the D0 upgrade project for Run II at the Tevatron is presented. After reviewing the design considerations the status of delivery and testing of the different silicon sensors is presented. The ladder production and assembly process is also discussed.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL
- Sponsoring Organization:
- USDOE Office of Energy Research (ER)
- DOE Contract Number:
- AC02-76CH03000
- OSTI ID:
- 11973
- Report Number(s):
- FERMILAB-Conf-99/247-E; ON: DE00011973
- Country of Publication:
- United States
- Language:
- English
Similar Records
D-Zero silicon microstrip tracker for Run IIA
The D{O} upgrade silicon tracker
The D[O] upgrade silicon tracker
Conference
·
Thu Dec 27 23:00:00 EST 2001
·
OSTI ID:789804
The D{O} upgrade silicon tracker
Conference
·
Sat Oct 31 23:00:00 EST 1992
·
OSTI ID:10161665
The D[O] upgrade silicon tracker
Conference
·
Sat Oct 31 23:00:00 EST 1992
·
OSTI ID:6532719