Design of the NSLS-II Top-Off Safety System
Conference
·
OSTI ID:1193210
- Brookhaven National Lab. (BNL), Upton, NY (United States). National Synchrotron Light Source
The NSLS-II accelerators finished commissioning in the fall of 2014, with beamline commissioning underway. Part of the design for the NSLS-II is to operate in top off mode. The Top Off Safety System (TOSS) is presently being installed. In this report we discuss the Top Off Safety System design and implementation, along with the necessary tracking results and radiological calculations.
- Research Organization:
- Brookhaven National Laboratory (BNL), Upton, NY (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC)
- DOE Contract Number:
- DE-SC00112704
- OSTI ID:
- 1193210
- Report Number(s):
- BNL-107998-2015-CP; R&D Project: LS001
- Resource Relation:
- Conference: IPAC15; Richmond, VA; 20150503 through 20150508
- Country of Publication:
- United States
- Language:
- English
Similar Records
APPLYING CASCADED PARAMETER SCAN TO STUDY TOP-OFF SAFETY IN NSLS-II STORAGE RING
Top-Off Safety Analysis for NSLS-II
Commissioning of NSLS-II
Conference
·
Mon Mar 28 00:00:00 EDT 2011
·
OSTI ID:1193210
Top-Off Safety Analysis for NSLS-II
Conference
·
Mon May 04 00:00:00 EDT 2009
·
OSTI ID:1193210
+6 more
Commissioning of NSLS-II
Conference
·
Sun May 03 00:00:00 EDT 2015
·
OSTI ID:1193210