Coiling temperature control at LTV Steel -- Level 2 automation and mathematical modeling
Journal Article
·
· Iron and Steel Engineer
OSTI ID:118861
- LTV Steel Co., Inc., Cleveland, OH (United States)
- Eastlake Automation Div., OH (United States)
- Clecim, Cergy Pontoise (France). Rolling Mill Div.
On July 9, 1992, LTV placed an order with Davy International for the design, fabrication and commissioning of a new runout table coiling temperature control systems for the DHCC hot strip mill through an approved electrical/automation upgraded project. This paper will discuss the coiling temperature upgrade, with focus on level 2 automation, mathematical modeling of the strip cooling process and the operator man-machine interface.
- OSTI ID:
- 118861
- Report Number(s):
- CONF-9509197-; ISSN 0021-1559; TRN: IM9546%%262
- Journal Information:
- Iron and Steel Engineer, Vol. 72, Issue 7; Conference: 1995 Association of Iron and Steel Engineers (AISE) annual convention, Pittsburgh, PA (United States), 25-28 Sep 1995; Other Information: PBD: Jul 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Health-hazard evaluation report HETA 91-027-2117, LTV Steel Company, East Chicago, Indiana
Retrofitting LTV coke plant wastewater treatment system to comply with pretreatment discharge limits
Health-hazard evaluation report HETA 87-252-1857, LTV Steel, Indiana Harbor Works, East Chicago, Indiana
Technical Report
·
Sat Jun 01 00:00:00 EDT 1991
·
OSTI ID:118861
Retrofitting LTV coke plant wastewater treatment system to comply with pretreatment discharge limits
Journal Article
·
Sat Oct 01 00:00:00 EDT 1994
· Iron and Steel Engineer; (United States)
·
OSTI ID:118861
Health-hazard evaluation report HETA 87-252-1857, LTV Steel, Indiana Harbor Works, East Chicago, Indiana
Technical Report
·
Fri Jan 01 00:00:00 EST 1988
·
OSTI ID:118861